Redesigning Stopes for Improved Recovery of Ore

By: Dyno Nobel Views: 1035Downloads: 84
Catalogue/Brochure

This underground nickel mine in the Midwest United States is relatively young with only a few years of production blasting. The operation is employing a sublevel stope mining technique. The operator purchases Dyno TITAN® RU emulsion and electronic detonators for blasting. The customer was experiencing poor blast results over a substantial period of time. When the customer first contacted DynoConsult® for assistance, the concern was the under-breaking of the ore which left valuable material along the ribs. At that time the mine engineers were looking for guidance on the delay times they should be using to improve the recovery of ore. During the site visit by DynoConsult, it was also discovered that there were a few instances of benches and bridges being left in the stope after mucking. In one stope it was estimated that over $1 million worth of ore was left unrecoverable in the stope. It was also revealed during the site visit that there were issues related to tight digging of the muckpile even though the fragmentation was adequate.

Download



Related Resources

Blast Design Changes to Accomm ...
BY: Dyno Nobel

Project goal is to remove a small section of bench and creating a final wall catch bench without disturbing neighboring homes within 750 feet of ...Read more


Blast Modeling
BY: Dyno Nobel

An application to determine how various blast patterns proposed for a project would perform in the field.Read more


Fragmentation Modeling in Unde ...
BY: Dyno Nobel

A fragmentation model developed in-house by Dyno Nobel was employed to model the fragmentation that would result from changes in the various blas ...Read more


Improved Digability, Reduced V ...
BY: Dyno Nobel

The use of SHA (Signature Hole Analysis) and electronic detonators allowed the mine to dial in optimum timing sequences regardless of the number ...Read more


Improved Fragmentation for Roa ...
BY: Dyno Nobel

As a new mine starting up development, this gold mine in Northern Ontario used much of the blasted rock for infrastructure in building up roads a ...Read more


Fragmentation Modeling to Achi ...
BY: Dyno Nobel

This operation was undergoing a complete review of its blasting practices and blast designs in order to ensure the most optimized results were be ...Read more